Hardware options installation 37
3.
Remove the access panel (on page
4.
Disconnect all internal cables connected to any existing expansion boards.
5.
Remove the PCIe riser cage (on page
6.
Remove the expansion slot covers.
7.
Install the expansion board.
IMPORTANT:
The server does not power up if the PCIe riser board assembly is not seated
properly.
8.
Install the PCIe riser cage (on page
9.
Connect all internal cables for expansion boards.
10.
Install the access panel (on page
11.
Install the server into the rack ("
Installing the server into the rack
" on page
12.
Power up the server ("
Powering up and configuring the server
" on page
, on page
Storage controller option
IMPORTANT:
For additional installation and configuration information, see the documentation
that ships with the option.
To install the component:
1.
Power down the server (on page
2.
Remove the server from the rack (on page
3.
Remove the access panel (on page
4.
Remove the PCIe riser cage (on page
5.
Remove the drive cables ("
" on page