Redundant hot-plug power supply option (with cage) – HP ProLiant DL120 G7 Server User Manual
Page 40

Hardware options installation 40
8.
Install the battery pack.
9.
Route the cable ("
" on page
10.
Install the PCIe riser cage (on page
11.
Install the access panel (on page
12.
Install the server into the rack ("
Installing the server into the rack
" on page
13.
Power up the server ("
Powering up and configuring the server
" on page
, on page
Redundant hot-plug power supply option (with cage)
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Remove the server from the rack (on page
4.
Remove the access panel (on page
5.
Remove the air baffle (on page
6.
Remove the PCIe riser cage (on page
7.
Disconnect any power cables connected to the front drive cage.
8.
Remove all cables connected to the system board.
9.
Remove the system board.