HP ProLiant DL120 G7 Server User Manual
Page 43
Advertising
Hardware options installation 43
o
Foam air baffle for an eight-bay SFF drive cage
19.
Install the access panel (on page
20.
Install the server into the rack ("
Installing the server into the rack
" on page
21.
Depending on the configuration, install either two power supplies, or one power supply blank and one
power supply.
o
Power supply blank
Advertising