Installation preparation, Parts provided, Hardware package – GE ZV54ISHSS User Manual

Page 10: Accessory package

Advertising
background image

10

49-80209-5

Installation Preparation

PARTS PROVIDED

Locate the parts packed with the hood.

HARDWARE PACKAGE

Locate and check
contents. Screws
shown actual size.

2 Grease trays (3 with 54” hood)

Implement rods with standoffs

Duct collar

Support frame for 8 ft. ceiling
with 4 large pan head screws
installed on the bottom corners.

2-piece decorative duct cover

Transition with Damper

Decorative top cover

2 Filters (3 with 54” hood)

ACCESSORY PACKAGE

Check accessory package.
Select the taller set for 9’6” to 10’4” ceilings.
Select the shorter set for 8’6” to 9’6” ceilings.
Discard unused set.

2 Templates

Allen Wrench

Screws A
4 (7/16”)
hex head
wood
screws

Screws B
2 (1/8” x 1-1/2”)
Phillips
pan head
screws.

Screws C

8 blunt point

Phillips

screws

Screw F

Blower safety screw and lock washer,

Phillips head M 6 x 16.

Note: Hardware appearance may vary slightly.

Screws E

2 Phillips

head wood

screws

2 Support Frames

with 8 height

adjustment

screws

2 Sets of Duct Covers

4 Attachment Screws

Screws D

2 small

Phillips

head

screws

Advertising