Installation instructions, 67(3 size and install ductwork – GE ZV54ISHSS User Manual

Page 14

Advertising
background image

14

49-80209-5

• Select the template for your hood size.
• Align the template with the marks on the ceiling

and tape in place.
– Be sure the template is oriented correctly,
with the front of the hood.

• Use a plumb to check to be sure the mount-

ing holes will provide parallel alignment with
the countertop below.

• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a

3/16” bit and drill approximately 1-1/2” deep.

• Drive 4 Hex head wood screws (Screws A) into

the center of the ceiling joists and cross fram-
ing. Leave a 1/4” gap to allow the screw head
to engage the keyhole slots on the support
frames.

• Cut the 10-1/2” duct opening through the

sheet rock.

67(3 028177(03/$7(

Installation Instructions

67(3 SIZE AND INSTALL DUCTWORK

• Measure from house duct flange to bottom of

support frame. Subtract 4-3/8” for clearance to the
bottom of the support frame.

• Cut the 10” duct length to size.
• Secure duct to house ducting with sheet metal

screws.

• Seal all connections with duct tape.
• Attach the duct collar loosely, about 1” from the

bottom of the duct using Screws B.

1/4" Gap

Screws B

Duct

Length

4-3/8" Clearance
to Bottom of Fram

Duct

Collar

House

Duct

Duct

Screws A

Advertising