Installation preparation, Important, Tools and materials required – GE ZV54ISHSS User Manual

Page 9: Remove the packaging

Advertising
background image

49-80209-5

9

Installation Preparation

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

Pencil and tape measure

Pliers

Electric or battery operated drill

and 3/16”, bits, Phillips and Flat

Blade Screwdriver bits.

120V 60Hz. 15 or 20 Amp,

2-wire with ground. Properly

grounded branch circuit.

Key Hole Saw

Hammer

Wire cutter/

stripper

Step ladder

Metal Snips

Saber saw

or Sawsall

Wire nuts

Phillips and flat

blade screwdrivers

Strain relief for

junction cover.

Spirit level

Flashlight

Safety glasses

10” round metal

duct, length to

suit installation.

Duct tape

7/16” Pivoting

hex socket with 4”

and 6” extensions

REMOVE THE PACKAGING

• Remove the parts packages and packing materials.
• Lift the hood out of the box.

IMPORTANT:

Lift the hood by grasping the

outside edges of the exhaust opening on the top.

• Carefully, lay the hood on its side. A support frame

is secured to the inside top of the hood. Remove
the attachment screws at the outside top. Discard
screws.

• Grasp the support

frame inside the
hood with both
hands and
carefully rotate
out of the open-
ing.

Be careful not to
scratch the hood.

Hood

Parts

Parts

Parts

Motor

Mounted

on Skid

Shipping Carton

• Place the hood on a protective surface to prevent

scratches and damage to the stainless steel finish.

• The hood motor is shipped secured to the skid with

4 screws. Locate and remove 2 screws on each side
of the motor. Discard the shipping skid and screws.

Carpenter’s square

Advertising