Installation instructions – GE ZV54ISHSS User Manual

Page 11

Advertising
background image

49-80209-5

11

Plan the Location of the Hood and Ductwork
• Use a plumb bob to check the location. The

countertop/cooktop below the hood must be centered
with the hood.

• The hood should extend beyond the front and rear

edge of the cooking appliance.

• The duct in the ceiling must be centered over the

cooktop.

67(3 &216758&7&(,/,1*6833257

Installation Instructions

Ceiling

Hood

Ducting

Centerline

42" Hood Side View

Align With

Center of

Cooktop

Cooktop

Countertop

31-3/4"

Front

15-7/8"

Align With

Center of

Cooktop

Ceiling

Hood
Ducting
Centerline

54" Hood Side View

Cooktop

Counter

36-1/4"

Front

18-1/8"

Top View – Ceiling Joists Parallel to Front of Hood

12-3/4” (42” Hood)

17” (54” Hood) Install

Cross-Framing

Symmetrically About

Duct/Cooktop Centerline

16” Joist

Spacing

8 5/8”

µ'XFW

Front

of

Hood

2x4 Cross

Framing

Cooktop

Outline

Align duct

to center of

Cooktop

Ceiling Support Structure
• At the hood location, install 2 x 4 cross framing

between ceiling joists as shown. (2x4’s are required to
support the weight of the hood.)

• Arrange cross framing in the ceiling to suit the exist-

ing structure.

• Your ceiling joists will be like one of the following

examples.

EXAMPLE A

Advertising