Advance planning, Installation height requirements, Determine installation height – GE ZV54ISHSS User Manual

Page 7

Advertising
background image

49-80209-5

7

INSTALLATION HEIGHT REQUIREMENTS

• These vent hoods must be installed 30” min. and

36” max. above the cooking surface – regardless of

the ceiling height. Therefore, installation height of

the hood depends on the exact ceiling height of the

kitchen.

• Accessories are available for ceiling heights 8’6” and

up to 10’4”.

Example: Hood installation height with 8 ft. ceilings.

• Both models are shipped with a support frame and

duct cover for 7’11” to 8’5” ceilings.

• If the ceiling height is 7’11”, the installation height

above the cooking surface will be 30”.

• If the ceiling height is 8’5”, the hood installation height

will be 36”.

DETERMINE INSTALLATION HEIGHT

 Measure the exact ceiling height.

 Review the chart to determine the range

of hood installation heights that can be

accomplished with or without an accessory kit.

ACCESSORIES
ZX42DC10 – Optional Accessory for ZV42I.
ZX54DC10 – Optional Accessory for ZV54I.
Accessories for ceiling heights of 8’6” to 10’4”.

Includes telescoping support frames and duct

covers.

ZV42I

ZV54I

8 ft. Ceiling

9”

Supplied

Duct

Cover

31”

8 ft. Ceiling

5”

Supplied

Duct

Cover

31”

Advance Planning

30" Min. and 36" Max.

36"

to

Countertop

Duct Cover

20" for ZV42

I

24" for ZV54

I

Ceiling

Height

0RGHO=9,

Actual

Chimney Length at

Duct

Ceiling

Hood Installation Height

Cover

+HLJKW

µ µ µ µ µ µ µ

.LW

10’4”

28

10’3”

28

27

Order

10’2” 28 27 26 ZX54DC10

10’1” 28 27 26 25 Use

Long

10’ 28 27 26 25 24 Support

9’11” 28 27 26 25 24 23 and

9’10” 28 27 26 25 24 23 22 Duct

Cover

9’9” 27 26 25 24 23 22 21

9’8” 26 25 24 23 22 21 20

9’7” 25 24 23 22 21 20 19

9’6” 24 23 22 21 20 19 18

9’5” 23 22 21 20 19 18 17

9’4” 22 21 20 19 18 17 16 Order

9’3” 21 20 19 18 17 16 15 ZX54DC10

9’2” 20 19 18 17 16 15 14 Use

Short

9’1” 19 18 17 16 15 14 13 Support

9’

18 17 16 15 14 13 12 and

8’11” 17 16 15 14 13 12 Duct

Cover

8’10”

16 15

14 13

12

8’9” 15 14 13 12

8’8” 14

13

12

8’7” 13

12

8’6” 12

8’5” 5 Use

8’4” 5

Supplied

8’3” 5 Support

8’2” 5 and

8’1” 5

Duct Cover

8’ 5

7’11”

5



0RGHO=9,

Actual

Chimney Length at

Duct

Ceiling

Hood Installation Height

Cover

+HLJKW

µ µ

µ µ µ µ µ .LW

10’4” 36 35 34 33 32

10’3” 36 35 34 33 32 31 Order

10’2” 36 35 34 33 32 31 30 ZX42DC10

10’1” 35 34 33 32 31 30 29 Use

Long

10’

34 33 32 31 30 29 28 Support

9’11” 33 32 31 30 29 28 27 and

9’10” 32 31 30 29 28 27 26 Duct

Cover

9’9” 31 30 29 28 27 26 25

9’8” 30 29 28 27 26 25 24

9’7” 29 28 27 26 25 24 23

9’6” 28 27 26 25 24 23 22

9’5” 27 26 25 24 23 22 21 Order

9’4” 26 25 24 23 22 21 20 ZX42DC10

9’3” 25 24 23 22 21 20 19 Use

Short

9’2” 24 23 22 21 20 19 18 Support

9’1” 23 22 21 20 19 18 17 and

9’

22 21 20 19 18 17 16 Duct

Cover

8’11” 21 20 19 18 17 16 15

8’10”

20

19

18 17 16

15

8’9” 19

18

17

16

15

8’8” 18

17

16

15

8’7” 17

16

15

8’6” 16

15

8’5” 15

9

8’4” 9 Use

8’3” 9 Supplied

8’2” 9 Support

8’1” 9

and

8’

9

Duct

Cover

7’11”

9

Advertising