Installation instructions – JELD-WEN JII015 Vinyl Patio Doors without Nailing Fin User Manual

Page 2

Advertising
background image

INSTALLATION INSTRUCTIONS

for Vinyl Patio Doors without Nailing Fin (JII015)

2

SAFETY

• Read and fully understand ALL manufacturers’ instructions before

beginning. Failure to follow proper installation instructions

may result in the denial of warranty claims for operational or

performance problems.

• Do not work alone. Two or more people are required. Use safe

lifting techniques.

• Use caution when handling glass. Broken or cracked glass can cause

serious injury.

• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s

operating instructions.

• Use caution when working at elevated heights.
• If disturbing existing paint, take proper precautions if lead paint is

suspected (commonly used before 1979). Your regional EPA

(www.epa.gov/lead) or Consumer Product Safety Commission offices

provide information regarding regulations and lead protection.

FULLY SHEATHED / OPEN-STUD WALL CONSTRUCTION

Fully sheathed wall
framing is covered
by sheathing. This
installation assumes
building wrap is
properly installed
prior to patio
door installation.

Open-Stud walls are not
covered by sheathing.

MATERIALS AND PATIO DOOR HANDLING

• Make sure the operating panel is secured prior to installation.
• Heed material manufacturers’ handling and application instructions.
• Protect adhesive surfaces from dirt, moisture, direct sunlight and

folding over onto themselves.

• Handle in vertical position; do not drag.
• Do not put stress on joints, corners or frames.
• Store patio door in dry, well-ventilated area in vertical, leaning

position to allow air circulation; do not stack horizontally.

• Protect from exposure to direct sunlight during storage.
• Install only into vertical walls and when conditions and sheathing

are dry.

• Never use solvent-based sealants on vinyl products.

IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!

This installation guide specifically addresses masonry/block wall,
sheathed wall and open-stud construction.

MASONRY/BLOCK WALL CONSTRUCTION

This installation
assumes that a
framework of 2x studs
(often called a buck)
has already been
properly fastened and
sealed to the concrete/
masonry wall by a
building professional.

PROVIDED MATERIALS

• 4 - #10 x 2 1/2" screws (to secure the strike plate).
• Vinyl caps to cover screw holes.

NEEDED MATERIALS

Note!

Follow all material manufacturers’ instructions for proper use

and compatibility. When using flashing, spray adhesive/primer, sealant

and foam products, we recommend using the same manufacturer and

verifying compatibility. It is the End User’s responsibility to determine if

dissimilar materials are compatible to the substrates in the application.
• #8 x 1 1/4" (minimum) washer head or pan head corrosion-resistant

screws (stainless steel recommended). Fasteners must penetrate at
least 1" into framing.

• 3/16" x 2 1/2" self-tapping concrete screws (if required to secure the

sill into concrete/masonry).

• Non compressible or water degradable shims.
• Sill pan: It is best practice to use a pre-formed, rigid, positively sloped,

pvc pan that provides continuous support. We recommend using SureSill

Sloped Sill Pan

, manufactured by SureSill

, Ltd. An alternative would

be a non-sloped pre-formed sill pan or one can be fabricated on site

from metal or vinyl sheet material with the proper tools.

• Sealant: We recommend OSI

®

QUAD

®

Max Sealant or equivalent. This

can be used in any application and can be painted or ordered in a

color matched product, if desired.

• Backer rod 1/8" larger than the widest portion of the gap (used in

conjunction with sealant bead).

• Polyurethane low expansion Window and Door foam: We recommend

OSI

®

QUAD

®

Foam or equivalent.

• 4", 6", or 9" (as required by local code and window configuration)

wide self-adhesive flashing: We recommend OSI

®

Butyl Flash Tape

or equivalent.

• Drip cap if required because of door location and exposure. Doors with

an adequate overhang (see our Appropriate Protection document at
www.jeld-wen.com) may not need a drip cap. In addition to sill pans,
SureSill

also offers types of head flashing.

For installations into a Buck:

• Liquid applied flashing (Protecto Wrap LWM 200 or equivalent).

NEEDED TOOLS

• Hacksaw (SureSill sill pan)

Cutting shears (fabricated

sill pan)

• Tape measure
• Utility knife
• Level (4' minimum

recommended)

• J-roller
• Caulking gun
• Drill with bits
• Clean rags
• Screwdrivers

ROUGH OPENINGS

SAFETY AND HANDLING

MATERIALS AND TOOLS

Buck

Trimmer

studs

Header

Sheathing

Sill area

King

stud

Advertising