JELD-WEN JII015 Vinyl Patio Doors without Nailing Fin User Manual

Page 6

Advertising
background image

INSTALLATION INSTRUCTIONS

for Vinyl Patio Doors without Nailing Fin (JII015)

6

INSTALL PATIO DOOR

6

Warning!

To avoid injury, use at least two people to install. Adequately

support the door until fully installed.

IF INSTALLING A FLUSH FIN PATIO DOOR

If installing a door with
a flush fin, apply at
least one continuous
3/8" bead of sealant to
the exterior face of the
side jambs and head.
Continue with the
instructions.

ALL INSTALLATIONS

1. If installing a

pre-formed sill
pan, follow
manufacturer’s
instructions and skip
this step. If installing
a job site fabricated
sill pan, run a
continuous 3/8" bead
of sealant along the
sill pan back dam.
When the frame is
installed, make sure
the frame makes
solid contact with the
sealant. Add more
sealant if necessary.

2. Tilt the frame into the rough opening. Adequately support the frame

until fully installed.

3. Align the exterior of the frame, or flush fin, with the most exterior

surface of the structure (the exterior face of the concrete wall,
framing or sheathing).

SHIM THE JAMBS

Note!

Secure all shims with sealant.

4. From the interior,

shim the head and
side jambs 4" from
the corners and at
the strike plate so
that strike plate
screws (installed
later) will each
penetrate a shim.
Shim so the door
is square, level
and plumb.

Sealant

4"

4"

4"

Strike

plate

Areas such as Florida and the Texas TDI region have different anchoring
requirements based on product certification. For information on specific
products, visit www.floridabuilding.org or www.tdi.texas.gov and
follow the anchoring schedule given in the drawings for the product
instead of the anchoring schedule in this document.
Patio doors will be fastened according to Performance Grade (PG)
rating. This rating is located on the gold AAMA label fixed somewhere
on the frame. Look for something like this example: R-

PG20

-3645X2426

(144X96)-SD. Mark fastener locations in the interior frame track of the
side jambs and head as follows:
• PG20–4" from each corner and every 24".
• PG35–4" from each corner and every 18".
• PG50 and above–4" from each corner and every 12".
5. At each fastener

location, insert shims
and only through
the first wall of the
jamb, drill a 3/8"
clearance hole. Then,
drill a 1/8" pilot hole
through the jamb
wall, shim and into
the framing.

6. Drive a washer or

pan head screw
through the shim
located 4" from one
upper corner.

7. Confirm the patio door is square, level, and plumb.

SECURE PATIO DOOR

Note!

Do not over tighten fasteners and do not allow fasteners to

deform the vinyl frame, it must be kept flat and straight.
1. At each remaining corner, fasten patio door through shims in the

same manner above. Test for proper operation (remove and reinstall
if necessary).

2. Drive screws through each of the remaining fastener locations.

Sealant

Exterior

Framing

Screw

3/8"

Clearance Hole

Jamb

Opposing

shims

Advertising