Installation of the flaming river rack and cradle – Flaming River C-10 Chevy Truck Rack and Pinion 1973-87 User Manual
Page 9
Advertising

Installation of the Flaming River Rack and Cradle
1) Remove the Rack from the cradle.
2) Install the rack and pinion cradle by sliding it over the frame rails
3) Installing the new hardware using three 7/16” bolts where the gear box was mounted and tighten the 7/16” nuts and bolts to
50-65 ft lbs.
4) Next place a level on the cradle and the level the cradle. Once the cradle is level, then mark and drill the passenger side
mounting holes.
73-87 C-10 Truck
Power Steering Rack and Pinion Cradle Kit
04/22/10
8
Advertising