Allied Telesis AT-SBx31CFC960 User Manual
Page 117
Advertising

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide
117
Figure 62. Locking the Handle on the AT-SBxPWRPOE1 AC Power
Supply
8. To install a second AT-SBxPWRPOE1 AC Power Supply, repeat this
procedure.
9. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter
7, “Installing the AT-SBx31CFC960 Card and Ethernet Line Cards” on
page 125.
Note
Retain the tie wrap that comes with the power supply. You use it to
secure the power cord to the chassis when you power on the unit in
“Powering on the AT-SBxPWRPOE1 AC Power Supply” on
page 176.
Advertising
This manual is related to the following products: