Chapter 10, Verifying the hardware operations of the chassis – Allied Telesis AT-SBx31CFC960 User Manual
Page 209
Advertising

209
Chapter 10
Verifying the Hardware Operations of
the Chassis
This chapter describes how to verify the operations of the chassis. The
chapter contains the following sections:
“Using the LEDs to Verify the Chassis” on page 210
“Using Local Management to Verify the Chassis” on page 212
“Running the Easy Startup Application” on page 216
Note
Allied Telesis recommends that you use both the LEDs and local
management to confirm the initial operations of the chassis,
controller cards, and Ethernet line cards.
Advertising
This manual is related to the following products: