Installation

Example: Installation for expansion

Correct

Incorrect

1.

Expansion loop/joint

Suction-piping checklist

Performance curve reference

CAUTION:
Vary the capacity with the regulating valve in the discharge line. Never throttle the flow from the suction
side. This action can result in decreased performance, unexpected heat generation, and equipment
damage.

Net positive suction head available (NPSH

A

) must always exceed NPSH required (NPSH

R

) as

shown on the published performance curve of the pump.
If a suction lift over 10 ft. (3 m) and a liquid temperature higher than 120°F (49°C) are required,
then read the pump performance curve for the NPSH

R

.

Suction-piping checks

Check

Explanation/comment

Checked

Flush all suction piping before you This reduces the risk of pump
connect it to the pump.

operation problems.

Check that the distance between

This minimizes the risk of cavita-

the inlet flange of the pump and

tion in the suction inlet of the

the closest elbow is at least two

pump due to turbulence.

pipe diameters.

See the Example sections for il-
lustrations.

Check that elbows in general do

See the Example sections for il-

not have sharp bends.

lustrations.

Check that the suction piping is

The suction piping must never

one or two sizes larger than the

have a smaller diameter than the

suction inlet of the pump.

suction inlet of the pump.

Install an eccentric reducer be-

See the Example sections for il-

tween the pump inlet and the

lustrations.

suction piping.
Check that the eccentric reducer

See the example illustrations.

at the suction flange of the pump
has the following properties:
• Sloping side down
• Horizontal side at the top