Nspection – Glastender LC47 User Manual

Page 11

Advertising
background image

Glastender, Inc. • 5400 North Michigan Road • Saginaw, MI • 48604-9780

800.748.0423 • 989.752.4275 • Fax 989.752.4444 • www.glastender.com

8

1. i

nsPection

u

Pon

a

rrival

:

Immediately upon arrival, a visual inspection of the carton should be made to determine if there is

evidence of damage in shipment. Following uncrating, make an inspection for any signs of external

damage.

2. s

et

-u

P

of

r

emote

G

lycol

l

ine

c

hiller

:

Once the survey of the location has been completed to determine the positioning of the remote glycol

line chiller and the connecting draft beer dispensing stations (refer to the specification sheet to be

certain that the trunk line will be within the recommended distance), make the necessary provisions

to locate the unit and provide for the electrical services.

The ideal set-up is to mount the glycol line chiller on a proper machine stand that is easily accessible

for routine maintenance and service.

In less-than-ideal circumstances, it may be necessary to locate the unit on top of the walk-in cooler or

on the floor.

NOTE: Do not locate the glycol chiller in the walk-in cooler, as the cold ambient temperature

will reduce the cooling performance of the unit.

Ensure that the unit receives adequate ventilation, by avoiding obstructions to the air

intake and exhaust grillwork on the unit.

If the unit is located on the floor:

• Ensure the cabinet is sealed to the floor with NSF listed silicon RTV sealant applied around the

entire bottom edge of the cabinet.

• Optional 4” legs and base plate may be installed to the bottom of the cabinet.

3. e

lectrical

h

ook

-u

P

:

Models LC65 and LC85 are supplied with a 15 Amp grounded cord and plug that connects at the rear

of the unit. Models LC86, LC44, and LC47 are supplied with a 20 Amp grounded cord and plug that

connects at the rear of the unit. A corresponding 15 Amp or 20 Amp grounded receptacle, depending

on the line chiller model used, must be installed within reach of the factory installed cord and plug.

4. G

lycol

l

ine

c

onnection

:

Install the insulated trunk line between the walk-in cooler, the glycol chiller and the dispensing

station(s).

i

nsPection

anD

s

et

-u

P

Advertising
This manual is related to the following products: