3 measurement setup flow, 3 measurement setup flow – WIKA DPT-10 User Manual
Page 16

4
.3 Measurement setup flow
à Mount DPT10 above the measurement loop so that condensate
can drain off in the process cable.
+
–
1
2
4
3
Fig. 10: Measurement setup, flow measurement in gases
1
DPT10
2
3
-fold valve block
3
Blocking valves
4
Orifice or impact pressure probe
à Mount DPT10 below the measurement loop
à Mount condensate vessels at the same height with the discharge
socket and at the same distance to DPT10
à For measurements in products with solid content such as e.g. dirty
liquids, the installation of separators and drain valves is
recommended to enable collection and removal of debris and
sediment.
à Fill the effective pressure lines to the height of the condensate
vessels before setup
In gases
In vapours
16
Differential pressure transmitter DPT10 - metal measuring diaphragm • Profibus PA
4 Mounting
37245
-EN
-100120