3 measurement setup flow, 3 measurement setup flow – WIKA DPT-10 User Manual

Page 16

Advertising
background image

4

.3 Measurement setup flow

à Mount DPT10 above the measurement loop so that condensate

can drain off in the process cable.

+

1

2

4

3

Fig. 10: Measurement setup, flow measurement in gases

1

DPT10

2

3

-fold valve block

3

Blocking valves

4

Orifice or impact pressure probe

à Mount DPT10 below the measurement loop

à Mount condensate vessels at the same height with the discharge

socket and at the same distance to DPT10

à For measurements in products with solid content such as e.g. dirty

liquids, the installation of separators and drain valves is
recommended to enable collection and removal of debris and
sediment.

à Fill the effective pressure lines to the height of the condensate

vessels before setup

In gases

In vapours

16

Differential pressure transmitter DPT10 - metal measuring diaphragm • Profibus PA

4 Mounting

37245

-EN

-100120

Advertising