Fitting procedure bull bar preparation – ARB 3415010 User Manual

Page 11

Advertising
background image

Last Rev Date:29/10/2008

Page 11 of 20

Fitting instructions# 3783250

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

FITTING PROCEDURE BULL BAR PREPARATION

37.

Remove indicators from cartons.

Remove fitted screw and speednut
assembly. These will not be reused.
New screws and grommets are supplied
in the fitting kit.

36. With

lenses

removed, replace 21W light bulbs

for indicator (amber reflector side) in supplied
indicator/run lamp assemblies with 10W bulbs
from fitting kit.

37.

Insert nylon nuts into square holes in light
brackets inside wing area.

38.

Fit lights using screws supplied in fitting
kit, taking note of RH and LH light bodies,
they are different and must be placed on
the correct side of bull bar. Vent holes
must be down,

Advertising