Operation – Fast & Fluid SK550 User Manual

Page 12

Advertising
background image

p12

Fast & Fluid Management - SK550

Operation

A - First time operation

Attention! Before operating your SK550 for the first time, please ensure
the frame lock was correctly removed (

Click here to see

)

Step 1 - SK550 power management

Unlock the emergency stop button on the front
of the machine by turning clockwise. The
machine is automatically switched on when the
power connector at the rear of the shaker is
plugged into a 220V or 110V wall socket.
Please be aware that the SK550 is fitted with a
sleeping timer as standard. This means that
after approximately 15 minutes the machine will
enter a stand-by modus automatically. The
display will then show the Fast & Fluid
Management logo. To awake the machine from
its sleeping modus, press any of the interface
buttons, the normal interface will then reappear.
Please note that during normal operation there
should be no reason ever to take the power off
the machine. In case the shaker must be
switched off (e.g. for maintenance) there is only
one way of achieving this: unplug the power
connector at the back of the machine.

Turn the emergency stop
clockwise to unlock: the
screen displays the startup
actions and 'ready' message.

Attention! To prevent damage, the SK550 may only be connected to
either 220V/16A/50Hz or 110V/25A/60Hz power grids.

Step 2 - Correct placement of cans and other containers

>

>

Place one or more containers
at gravitational center of the
can table, between the
spindles.

Place filler disc on lid to
prevent displacement during
operation.

Use the hook to fixate the can
handle. When mixing more
than one can, use adhesive
tape.

Advertising