Transporting a Load

• After engaging the load and resting it against the backrest, tilt the load back to

position it for travel. Travel in accordance with the requirements set forth in
Section 1 - General Safety Practices and Section 5 - Attachments and Hitches.

• If equipped, boom ride control mode (see page 3-25) is recommended for

transport of a load over longer distances. When activated, the boom ride control
system acts to cushion boom movement.

Leveling Procedure

1. Position machine in best location to lift or place load.

2. Apply parking brake and shift transmission to NEUTRAL.

3. Observe level indicator(s) to determine whether machine must be leveled prior

to lifting load. If equipped, level machine with frame level switch (see
page 3-25) or outrigger controls (see page 3-19 or 3-22).

4. Move boom/attachment to 1,2 m (4 ft) off ground.

(AUS - Move boom so forks are no more than 300 mm (11.8 in) above ground
surface.)

Important things to remember:

• Never raise the boom/attachment more than 1,2 m (4 ft) above ground unless

telehandler is level.
(AUS - Never raise the forks more than 300 mm (11.8 in) above ground surface
unless telehandler is level.)

• The combination of frame leveling and load could cause the telehandler to tip

over.