JLG 4017PS Operator Manual User Manual

Page 112

Advertising
background image

Section 5 - Attachments and Hitches

5-20

31200753

Mechanical Quick Attach

This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-3.

1. Tilt quick attach forward to provide clearance.

Unhook lock pin handle and pull to disengage
lock pin.

2. Align attachment pin with recess in attachment.

Raise boom slightly to engage attachment pin in
recess.

3. Tilt quick attach back to engage attachment.

4. Push lock pin handle to engage quick attach lock

pin and secure with hook.

5. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic

Operated Attachment” on page 5-22.

OAM2850

OAM2860

OAM2870

OAM2870

Advertising
This manual is related to the following products: