JLG 4017PS Operator Manual User Manual

Page 135

Advertising
background image

Section 5 - Attachments and Hitches

5-43

31200753

To control mixer:

The attachment auxiliary hydraulic roller switch (3) controls the bucket mixer.

• Push roller switch down to rotate rearward.

• Push roller switch up to rotate forward.

Installation Procedure:

• Refer to “Attachment Installation” on page 5-11.

Operation:

• Close bucket gate, level bucket and fully retract and lower boom to load material.

• Distribute material evenly within the bucket. Bucket capacity charts are for evenly

distributed loads only.

• Load center will vary depending on the amount of material in the bucket. Always

ensure compliance with the capacity chart.

• Travel in accordance with requirements set forth in Section 1 - General Safety

Practices.

• Position bucket and open bucket gate to release load.

Equipment Damage Precautions

• Transport the concrete bucket as low as practical at a slow speed and without

rapid side to side movement.

Advertising
This manual is related to the following products: