JLG 4017PS Operator Manual User Manual

Page 107

Advertising
background image

Section 5 - Attachments and Hitches

5-15

31200753

This installation procedure is designed for one-person operation.

1. Tilt attach forward to provide clearance. Check to

be sure lock pin is disengaged.

2. Align quick attach point with opening in

attachment. Raise boom slightly to engage quick
attach point in opening.

3. Tilt quick attach back to engage attachment.

4. Press and hold button (1) and at the

same time push roller switch down (2) to
engage lock pin or push roller switch up
to disengage lock pin.

5. Raise boom to eye level and visually check that the lock pin protrudes through

the attachment hole. If the pin does not protrude through the attachment hole,
place the attachment on the ground and return to step 2.

6. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic

Operated Attachment” on page 5-22.

OAM2290

OAM2300

OAM2310

2

1

OB0250

Advertising
This manual is related to the following products: