5 inspection and use of fall arrest system, 5 inspection and use of fall arrest, System -17 – JLG 740AJ Operator Manual User Manual

Page 37

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121295

– JLG Lift –

2-17

14. Carefully activate SWING control lever and return boom

to stowed position (centered between drive wheels).
When boom reaches center, stowed position, lockout
cylinders should release and allow wheel to rest on
ground, it may be necessary to activate DRIVE to
release cylinders.

15. If lockout cylinders do not function properly, have quali-

fied personnel correct the malfunction prior to any fur-
ther operation.

2.5 INSPECTION AND USE OF FALL ARREST

SYSTEM

The external fall arrest system is designed to provide a lanyard
attach point while allowing the operator to access areas outside
the platform. Exit/Enter the platform through the gate area only.
The system is designed for use by one person.

Personnel must use fall protection at all times. A full body
harness and shock absorbing lanyard, not to exceed 6 feet
(1.8 m) in length, is required when using the external fall
arrest system.

DO NOT OPERATE ANY MACHINE FUNCTIONS WHILE OUTSIDE OF
PLATFORM. BE CAREFUL WHEN ENTERING/EXITING THE PLATFORM
AT ELEVATION.

THE EXTERNAL FALL ARREST SYSTEM REQUIRES AN ANNUAL INSPEC-
TION AND CERTIFICATION. THE ANNUAL INSPECTION AND CERTIFICA-
TION MUST BE PERFORMED BY A COMPETENT PERSON.

If inspection services are required, contact:

Latchways plc
Hopton Park
Devises
Wiltshire
SN10 2JP
United Kingdom
Tel: +44 (0)1380 732700
Fax: +44 (0)1380 732701
e-mail: [email protected]

Prior to accessing areas outside of the fall arrest platform, the
user(s) must complete an appropriate job plan/risk assessment
for the work to be accomplished and the environment at hand. It
is the user’s responsibility to completely and adequately com-
plete the job plan/risk assessment - special consideration must

Advertising