4.17 AIR COMPRESSOR

Normal Startup Procedure

1. Check compressor oil level - top up if necessary.

2. Air service valve (beside the compressor) closed.

3. Start the engine.

4. Compressor switch (in the platform) ON - compressor

should activate.

5. Allow the compressor to warm up for several minutes

before operating.

Normal Shutdown Procedure

1. Close service valve and allow compressor to unload and

cool down (approx. 5 min.).

2. Position the compressor switch in the platform to OFF.

3. Shut down the engine.

Daily Operation

Before Starting:

1. Check compressor oil level.

2. Check for any leaks or loose bolts.

3. Check drive belt is tight.

After Starting:

1. Check pressure gauge for correct operating pressure.

2. Check for leaks.