JLG 600A_AJ Operator Manual User Manual

Page 41

Advertising
background image

SECTION 3 - MACHINE CONTROLS AND INDICATORS

3121204

– JLG Lift –

3-5

WHEN OPERATING THE BOOM ENSURE THERE ARE NO PERSONNEL
AROUND OR UNDER PLATFORM.

TO AVOID SERIOUS INJURY, DO NOT OPERATE MACHINE IF ANY CON-
TROL LEVERS OR TOGGLE SWITCHES CONTROLLING PLATFORM
MOVEMENT DO NOT RETURN TO THE OFF POSITION WHEN RELEASED.

10. Tower Lift

This switch provides raising and lowering of the tower
boom. This function works only when the tower boom is
fully retracted (telescope in).

11. Main Lift Control

Provides raising and lowering of the main boom.

12. Main Telescope Control

Provides extension and retraction of the boom, when
positioned to IN or OUT.

Advertising