JLG 600A_AJ Operator Manual User Manual
Page 41
Advertising
SECTION 3 - MACHINE CONTROLS AND INDICATORS
3121204
– JLG Lift –
3-5
WHEN OPERATING THE BOOM ENSURE THERE ARE NO PERSONNEL
AROUND OR UNDER PLATFORM.
TO AVOID SERIOUS INJURY, DO NOT OPERATE MACHINE IF ANY CON-
TROL LEVERS OR TOGGLE SWITCHES CONTROLLING PLATFORM
MOVEMENT DO NOT RETURN TO THE OFF POSITION WHEN RELEASED.
10. Tower Lift
This switch provides raising and lowering of the tower
boom. This function works only when the tower boom is
fully retracted (telescope in).
11. Main Lift Control
Provides raising and lowering of the main boom.
12. Main Telescope Control
Provides extension and retraction of the boom, when
positioned to IN or OUT.
Advertising