2 dash switches, Dash switches – JLG G12-55A Service Manual User Manual

Page 181

Advertising
background image

9-39

G10-55A, G12-55A

Electrical System

9.12.2

Dash Switches

a. Switch Removal

1. Park the machine on a firm, level surface, level the

machine, fully retract the boom, lower the boom,
place the transmission control lever in
(N) NEUTRAL, engage the park brake and shut the
engine OFF.

2. Place a Do Not Operate Tag on both the ignition key

switch and the steering wheel, stating that the
machine should not be operated.

3. Open the engine cover. Allow the system fluids to

cool.

4. Properly disconnect the battery.

5. There are three frames with three switches in each

frame.

6. Pull the frame out of the dash, disconnect the

harness connector to the switch in question and
push the switch out of the frame.

b. Disassembly

DO NOT disassemble the dash switch. Replace a
defective switch with a new part.

c. Inspection and Replacement

Inspect the switch terminals for continuity and shorting in
both the engaged and disengaged positions. Replace a
defective or faulty switch with a new switch.

d. Switch Installation

1. Connect the switch to the cab harness connector.

2. Position the switch over the rectangular switch bezel

and snap into position.

3. Properly connect the battery.

4. Start the machine and check the replaced switch for

proper function.

5. Close and secure the engine cover.

6. Remove the Do Not Operate Tags from both the

ignition key switch and the steering wheel.

Advertising
This manual is related to the following products: