2 assembling the hose carrier assembly, 3 hose carrier-assembly installation, Assembling the hose carrier assembly – JLG G12-55A Service Manual User Manual

Page 55: Hose carrier-assembly installation

Advertising
background image

3-21

G10-55A, G12-55A

Boom

13. When the hose carrier is pulled approximately 25%

out of the boom, fasten the two hydraulic carriers
together using plastic tie wraps or nylon straps to
keep them from separating.

Note: Do Not wrap the hose carrier since it will not
prevent the two hydraulic carriers from moving apart
sideways.

14. Continue withdrawing the hose carrier, fastening the

two hydraulic carriers together.

15. With the two hose assemblies tied together, remove

the hose carrier and set on the ground or proper
supports.

3.8.2

Assembling the Hose Carrier
Assembly

The following procedure is described with the assumption
that all components have been removed and assembly
proceeding from the beginning.

1. Place both sections on a suitable stand or support.

2. Install the wear pad to the bottom of the upper

hydraulic carrier.

3. Install the bulkhead fittings to the each hydraulic

carrier.

4. Install the tube assemblies to the bulkhead fittings

on each hydraulic carrier.

5. Install the cushion clamps to the tube assemblies

and secure to each hydraulic carrier.

6. Install the hose carrier to each hydraulic carrier and

install each tilt hose and auxiliary hose to the proper
fitting or tube connection.

7. Tie wrap the hydraulic hoses together where they

extend from each end of the hose carrier.

8. Fasten the two hydraulic carriers together using

plastic tie wraps or nylon straps for stability.

3.8.3

Hose Carrier-Assembly Installation

1. Clean and lubricate the side surfaces where the hose

carrier rides.

2. Fully collapse the hose carriers and secure together

using plastic tie wraps or nylon straps to keep them
from separating.

3. Install a sling around the balance point of the hose

carrier. With a suitable lifting device, slowly insert the
hose carrier into the front of the fourth boom section.

4. Remove the first plastic tie wrap or nylon strap as

the hose carrier is being inserted into the front of the
fourth boom section.

5. Continue inserting the hose carrier and removing the

plastic tie wraps or nylon straps until the hose carrier
is fully inserted into the boom.

6. Install the guide bracket (1) on the front of the hose

carrier.

7. Verify that the bottom bracket (2) on the hose carrier

is in place on the bottom plate (3) of the fourth boom
section.

8. Install the cap screws, washers and nuts to the hose

carrier bracket at the rear of the third boom section.

9. Install both cap screws and locknuts to the hose

carrier bracket at the front of the fourth boom
section.

10. Uncap and reconnect the previously labeled tilt and

auxiliary hydraulic hoses to the proper fittings at the
rear of the hose carrier.

MY2730

MY2740

1

MY2700

3

FRONT

2

Advertising
This manual is related to the following products: