6 hose carrier installation, Hose carrier installation – JLG G12-55A Service Manual User Manual

Page 45

Advertising
background image

3-11

G10-55A, G12-55A

Boom

3.5.6

Hose Carrier Installation

1. Inspect the hose carrier track (6) for any broken or

missing clips. Repair or replace as needed.

2. Remove the caps from the tubes on the hose carrier.

Note: Connect the tilt cylinder hoses and the auxiliary
hoses to the hose carrier bulkhead before installing the
hose carrier in the fourth boom section.

3. Install tilt cylinder hose (7) to the bottom left fitting on

the hose carrier tube (8).

4. Install tilt cylinder hose (9) to the top left fitting on the

hose carrier tube (10).

5. Install adaptors (11) to each auxiliary tube at the

front right of the hose carrier.

6. Install auxiliary hoses (12) to each adaptor (11) no

the auxiliary tubes at the front right of the hose
carrier.

7. Orient each auxiliary hose (12) as shown above.

8. Torque each fitting and hose as required.

9. Install the previously removed hose carrier guide

bracket (13). Torque as required.

10. Install the hose carrier (14) into the front of the fourth

boom section. Remove each nylon tie or nylon strap
as the hose carrier is installed.

11. Align the hose carrier (14) to the hose carrier guide

bracket (13).

12. Align the hose carrier mounting bracket and install

the previously removed hardware to mounting
bracket at the front of the fourth boom section (15).
Torque as required.

MY3480

6

6

MY3750

7

8

9

10

11

12

12

MY3610

14

13

FRONT OF BOOM

MY3470

15

Advertising
This manual is related to the following products: