Setting gas/air pressure, Sequence of operation, Skycutter trigger -5 – JLG Workstation in the Sky-Boom Lifts User Manual
Page 107
Advertising
SECTION 5 - SKYCUTTER™
3124242
– JLG Accessory Manual –
5-5
Setting Gas/Air Pressure
1. Place output control in gas/air position and turn on gas/air supply.
2. Lift knob and turn to adjust pressure to 60 PSI (414 kpa).
3. Push knob down to lock in setting.
4. Place output control in desired cutting output.
Sequence of Operation
THE PILOT ARC STARTS IMMEDIATELY WHEN TRIGGER IS PRESSED.
1. Place tip just off edge of work for drag cutting or for maximum cutting
speed and tip life, use a standoff distance of 1/16 inch (1.6 mm) to 1/8
inch (3.2 mm) (dragging tip will reduce tip life).
2. Raise trigger lock and press trigger. Pilot arc starts.
Figure 5-2. SkyCutter Trigger
Advertising