Installation and removal (after market kits) – JLG Workstation in the Sky-Boom Lifts User Manual

Page 20

Advertising
background image

SECTION 1 - SKYGLAZIER™

1-6

– JLG Accessory Manual –

3124242

INSTALLATION AND REMOVAL

(AFTER MARKET KITS)

8.2k Rotator (9 Hole Configuration) (2902231) and 9k

Rotator (7 Hole Configuration) (2902232) Glazier Kit

Installation

NOTE: For side entry platforms only.

1. Install platform support (4846573) or(4846616) onto rotator.

a. (2902231) Insert (8) 3/8-16 x1” or (2902232) Insert (6) 1/2-13 x 1"

bolts w/loctite #242 and torque to 50-55 lbs-ft.

b. (2902231) Insert the 1-8x10 1/4” or (2902232) 1-8x11” bolt through

the center and torque nut to 480 lbs-ft.

2. Install Glazier base (1001099366 - left & 1001099367 - right) and plat-

form (3510822) onto the platform support.

a. Align base hole pattern with the hole pattern in the platform sup-

port.

b. Place platform onto the base and align similarly.
c. Secure with supplied hardware (8) 1/2-13x21/2” bolts, (16) 1/2”

washers, and (8) 1/2” nuts and loctite #242. Then torque to 85 lbs-
ft.

3. Replace control box and foot switch with existing hardware.

4. Mount Glazier tray (1001101421) onto Glazier base.

a. Secure tray with supplied hardware (4) 3/4-10x2” bolts, (4) 3/4”

nuts, and (8) 3/4 washers and torque to 260 lbs-ft.

5. Install bumper and strap kit as shown.

6. To remove reverse instructions.

NOTE: Models 1200SJP, 1250AJP, 1350SJP and 1500SJ must be recali-

brated. Refer to Service and Maintenance Manual for calibration proce-
dure.