Service and maintenance, Installation and removal, Removal – JLG Workstation in the Sky-Boom Lifts User Manual

Page 109: Installation, Installation and removal -7 removal -7, Installation -7

Advertising
background image

SECTION 5 - SKYCUTTER™

3124242

– JLG Accessory Manual –

5-7

SERVICE AND MAINTENANCE

Refer to Miller Plasma Cutter Service and Maintenance Manual.

INSTALLATION AND REMOVAL

Removal

1. Unplug SkyCutter™ at twistlock plug.

2. Remove air/gas source.

3. Unbolt SkyCutter™ from weldment support.

4. Remove for storage.

Installation

1. Place SkyCutter™ in Weldment support.

2. Bolt top plate weldment support.

3. Connect twistlock plug.

4. Connect air/gas source.

Advertising