JLG G10-43A (0160005444 & After) Operator Manual User Manual

Page 96

Advertising
background image

Section 5 - Attachments

5-14

31200150

Before S/N 0160037671

This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-5.

1. Tilt quick switch back to provide clearance. Check

to be sure lock pin is secured in out position with
retainer pin.

2. Align attachment pin with recess in attachment.

Raise boom slightly to engage attachment pin in
recess.

3. Tilt quick switch forward to engage attachment.

4. Remove retainer pin and slide lock pin in fully.

Secure lock pin in locked position using retainer
pin.

5. If equipped, swing attachment saddles down and

pin in place.

6. If equipped, connect auxiliary hydraulic hoses. See “Hydraulic Operated

Attachment” on page 5-16.

7. If equipped, connect auxiliary electric harness.

OY1840

OY1850

OY1860

OY1860

OY0601

Advertising
This manual is related to the following products: