General -8, Daily walk-around inspection points, Sheet 1 of 2 -8 – JLG 24RS Operator Manual User Manual

Page 28: General

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-8

– JLG Lift –

3121286

General

Begin the "Walk-Around Inspection" at Item 1, as noted on
the diagram. Continue checking each item in sequence for
the conditions listed in the following checklist.

TO AVOID POSSIBLE INJURY BE SURE MACHINE POWER IS OFF .

INSPECTION NOTE: On all components, make sure there
are no loose or missing parts, that they are securely fas-
tened, and no visible damage, leaks or excessive wear
exists in addition to any other criteria mentioned.

1. Platform Assembly and Gate - Footswitch works prop-

erly, not modified, disabled or blocked. Latch and
hinges in working condition.

2. Platform & Ground Control Consoles - Switches and

levers return to neutral, decals/placards secure and
legible, control markings legible.

3. Rotator - See Inspection Note.

4. Power Track - See Inspection Note.

5. All Hydraulic Cylinders - See Inspection Note.

6. King Pins - Evidence of proper lubrication.

7. Drive Motor, Brake, and Hub - See Inspection Note.

Figure 2-3. Daily Walk-Around Inspection Points - Sheet 1 of 2

Advertising