Shutdown procedure, Shutdown procedure -6 – JLG 24RS Operator Manual User Manual

Page 50

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-6

– JLG Lift –

3121286

6. From Platform, pull Power/Emergency Stop

switch out.

7. Push the Engine Start switch until engine

starts.

NOTE:

Footswitch must be in released (up) position before
starter will operate. If starter operates with footswitch in
the depressed position, DO NOT OPERATE MACHINE.

Shutdown Procedure

IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED SHUT-
DOWN, DETERMINE THE CAUSE AND CORRECT IT BEFORE RESTART-
ING THE ENGINE.

1. Remove all load and allow engine to operate at low

speed for 3-5 minutes; this allows further reduction of
internal engine temperature.

2. Push Power/Emergency Stop switch in.

3. Turn Platform/Ground Select switch to Off.

Refer to Engine Manufacturer’s manual for
detailed information.