Wheel torque chart -17 – JLG 24RS Operator Manual User Manual

Page 89

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

3121286

– JLG Lift –

6-17

mounting stud holes in the wheels. The proper procedure for
attaching wheels is as follows:

1. Start all nuts by hand to prevent cross threading. DO

NOT use a lubricant on threads or nuts.

2. Tighten nuts in the following sequence.

3. The tightening of the nuts should be done in stages. Fol-

lowing the recommended sequence, tighten nuts per
wheel torque.

4. Wheel nuts should be torqued before first road use and

after each wheel removal. Check and torque every 3
months or 150 hours of operation.

1

2

3

4

5

6

7

8

9

Table 6-9. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

40 ft lbs (55 Nm)

95 ft lbs (130 Nm)

170 ft lbs (230 Nm)

Advertising