Swinging the boom, Raising and lowering the main boom, Telescoping the main boom – JLG 24RS Operator Manual User Manual

Page 55

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121286

– JLG Lift –

4-11

TO AVOID SERIOUS INJURY, DO NOT OPERATE MACHINERY IF ANY
CONTROL LEVER OR TOGGLE SWITCH CONTROLLING PLATFORM
MOVEMENT DOES NOT RETURN TO THE ‘OFF’ OR NEUTRAL POSITION
WHEN RELEASED.

TO AVOID A COLLISION AND INJURY IF PLATFORM DOES NOT STOP
WHEN A CONTROL SWITCH OR LEVER IS RELEASED, REMOVE FOOT
FROM FOOTSWITCH OR USE EMERGENCY STOP SWITCH TO STOP THE
MACHINE.

Swinging the Boom

To swing boom, use Swing control to select Right
or Left direction.

WHEN SWINGING THE BOOM MAKE SURE THERE IS AMPLE ROOM FOR
THE BOOM TO CLEAR SURROUNDING WALLS, PARTITIONS AND EQUIP-
MENT.

Raising and Lowering the Main Boom

To raise or lower the Main Boom, position the Main
Boom Lift switch to Up or Down until the desired
height is reached.

Telescoping the Main Boom

THIS MACHINE USES A TWO-STAGE TELESCOPE CYLINDER. AS THE
CYLINDER SHIFTS BETWEEN STAGES, TELESCOPE SPEED WILL
CHANGE.

To extend or retract the main boom, use the Main
Telescope Control Switch to select IN or OUT
movement.

Advertising