JLG 723A Operator Manual User Manual

Page 95

Advertising
background image

Section 5 - Attachments and Hitches

5-11

31200567

This installation procedure is designed for one-person operation.

1. Tilt quick attach forward to provide clearance.

Check to be sure lock pin is disengaged.

2. Align coupler point with opening in attachment.

Raise boom slightly to engage coupler point in
opening.

3. Tilt quick attach back to engage attachment.

4. Press and hold switch (1) and button

(2), at the same time move the joystick
forward to engage the JD quick attach
pin or move the joystick back to
disengage the JD quick attach pin.

5. Raise boom to eye level and visually check

that the quick attach pin protrudes through
the attachment hole. If the pin does not
protrude through the hole, place the
attachment on the ground and return to
step 2.

6. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic

Operated Attachment” on page 5-12.

OAH1640

OAH1650

OAH1660

OAH1620

1

2

OAH2010

ENGAGED

DISENGAGED

Advertising
This manual is related to the following products: