Section 8 - additional checks, 1 general, E section 8 - additional – JLG 723A Operator Manual User Manual

Page 155: Checks

Advertising
background image

Section 8 - Additional Checks

8-1

31200567

SECTION 8 - ADDITIONAL CHECKS

8.1

GENERAL

If any test gives a different result, the system is not functioning properly and
the machine must be removed from service and repaired before continued
operation.

8.2

LOAD STABILITY INDICATOR TEST (L2906H, 2906H &
3507H)

A. Load Stability Indicator System Test

The Load Stability Indicator (LSI) is intended to continuously monitor the forward
stability of the telehandler. To check this feature, perform the following:

Before S/N 1160005989 excluding 1160005189, 1160005314 & 1160005414

1. Fully retract and level boom, with no load. Do not raise the boom during

this test.

2. Ensure frame is level.

3. Press the test button on the LSI display. This will cause all LEDs to flash on and

an audible warning to sound. This indicates that the system is functioning
properly.

S/N 1160005989 & After including 1160005189, 1160005314 & 1160005414

1. Fully retract and level boom, with no load. Do not raise the boom during

this test.

2. Ensure frame is level.

3. Press the system check button on the LSI display. This will cause all LEDs to

flash on and an audible warning to sound. This indicates that the system is
functioning properly.

10

OW0970

OZ0840

Advertising
This manual is related to the following products: