3 manual procedures, Manual platform deck retraction, Manual procedures -3 – JLG 67SL Operator Manual User Manual
Page 59: Manual platform deck retraction -3
Advertising
SECTION 5 - EMERGENCY PROCEDURES
3121321
– JLG Lift –
5-3
5.3
MANUAL PROCEDURES
Manual Platform Deck Retraction
NOTE:
The platform deck extension should be retracted before
the platform lowering begins.
1. Locate the valve block and hand pump inside the
hydraulic cover on the right side of the machine.
2. Turn valve knob on the manual hand pump clockwise
until tight.
NOTE:
Step 2 applies only to machines prior to S/N 1200021189.
3. Locate the middle valve handle on the small valve bank
as shown and pull down to engage.
NOTE:
Step 3 applies only to machines prior to S/N 1200021189.
Advertising