JLG 67SL Operator Manual User Manual

Page 60

Advertising
background image

SECTION 5 - EMERGENCY PROCEDURES

5-4

– JLG Lift –

3121321

4. Locate separate valve handle in the storage bag and

place on the push cylinder valve of the main hydraulic

block. (1

st

section from the left).

NOTE:

Valve handles are located in plastic storage bag within
valve compartment.

5. Open valve by pulling handle down.

6. While continuing to hold the valve open, activate the

manual hand pump by pumping back and forth until the
deck extension is fully retracted.

7. After manual platform deck retraction is complete,

release valve on the valve bank and remove handle from
valve. Return the valve handle on the small valve bank
back to it’s original position (if applicable). Turn the
valve on the manual hand pump counterclockwise until
fully open (if applicable). Push pump handle forward.

8. Remove handle and place back into storage bag.

Advertising