JLG 67SL Operator Manual User Manual
Page 79
Advertising
SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
3121321
– JLG Lift –
6-15
3. The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten the nuts
per wheel torque chart.
4. Wheel nuts should be torqued after the first 50 hours of
operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
150-190 ft lbs
(210 - 270 Nm)
230 - 270 ft lbs
(320-380 Nm)
305 - 343 ft lbs
( 440 - 480 Nm)
Advertising