JLG 67SL Operator Manual User Manual

Page 79

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE

3121321

– JLG Lift –

6-15

3. The tightening of the nuts should be done in stages. Fol-

lowing the recommended sequence, tighten the nuts

per wheel torque chart.

4. Wheel nuts should be torqued after the first 50 hours of

operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

150-190 ft lbs

(210 - 270 Nm)

230 - 270 ft lbs

(320-380 Nm)

305 - 343 ft lbs

( 440 - 480 Nm)

Advertising