Important – JLG 80HX_HX+6_HXER ANSI Service Manual User Manual

Page 39

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120271

– JLG Lift –

3-1

SECTION 3. CHASSIS & TURNTABLE

3.1

TORQUE HUB

(See Figure 3-1.)

Disassembly

1.

Position hub over suitable container and remove
drain plugs (10) from unit. Allow oil to completely
drain, then replace drain plugs.

2.

Remove eight bolts (41) and four shoulder bolts (42)
securing cover assembly to hub 7. Remove cover
assembly and discard o-ring seal (22).

3.

Lift carrier assembly and top thrust washer (39) from
hub. Thrust washer may stick inside cover.

4.

Pry ring gear (21) loose from hub and remove it.
Remove o-ring seal (22) from hub counterbore and
discard it.

5.

Remove input gear (37) and thrustwashers (36,38)
from input shaft assembly and remove input shaft
assembly from hub.

6.

Lift internal gear (12) and thrustwasher (39) from
hub. Thrust washer may stick to bottom of carrier.

7.

Remove retaining ring (9) from spindle (1) and lift
hub from spindle.

EYE PROTECTION SHOULD BE WORN DURING RETAINING RING
REMOVAL.

8.

Remove inside bearing cone (6) and bearing shim 8.

9.

If necessary, pry seal (2) out of hub using screw-
driver or pry bar. With seal removed, outside bearing
cone (4) can be removed.

10.

If necessary, remove inner and outer bearing cones
(3,5) using a suitable slide hammer puller.

IMPORTANT

WHEN REBUILDING TORQUE HUB, REMOVE AND REPLACE ALL
O-RINGS AND RETAINING RINGS.

Cleaning and Inspection

1.

Thoroughly clean all parts in an approved cleaning
solvent.

2.

Inspect bearing cups and cones for damage, pitting,
corrosion, or excessive wear. If necessary, replace
bearings as a complete set ensuring that they
remain covered until use.

3.

Inspect bearing mounting surfaces on spindle, hub,
input shaft and carrier. Replace components as nec-
essary.

4.

Inspect all geared components for chipped or bro-
ken teeth and for excessive or uneven wear pat-
terns.

5.

Inspect carrier for damage, especially in anti-roll pin
and planet shaft hole areas.

6.

Inspect all planet shafts for scoring or other dam-
age.

Advertising