JLG 80HX_HX+6_HXER ANSI Service Manual User Manual

Page 86

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-6

– JLG Lift –

3120271

chain end; install the clevis pin through the
attaching holes. Install the washer and cotter pin
which secures the clevis pin through the chain
attachment assembly.

21.

Align the cylinder rod-end attachment point with
those of the boom base section. If necessary, use an
auxiliary hydraulic power source to extend and
retract the cylinder rod for alignment. Install the
cross pin through the base boom section and cylin-
der rod. Install the snap rings onto the cross pin.

22.

Align the chain attachment assembly holes with the
threaded mounting holes at the aft end of the boom
by installing the bolts and washers.

23.

Insert the threaded end of the chain attachment cle-
vis bolt through the large hole of the chain attach-
ment weldment. Loosely install the jam nut and nut
onto the threaded end of clevis bolt.

24.

Assemble and install the retraction chain attachment
and adjustment assembly as follows:

a. Place the clevis bolt on the bottom plate and

place the top plate onto the clevis assembly.
Secure the clevis bolt with clevis pins, washers
and new cotter pins.

b. Insert chain attach blocks between the clevis

plates ensuring the attachment points are prop-
erly aligned. Secure the block in position with
bolts, nuts and new cotter pins.

c. Align the retraction chains with the clevis attach

blocks; secure the chains with clevis pins, wash-
ers and new cotter pins.

d. Position the bolt end of the extension-adjust-

ment clevis into the boom mounted bracket.
Secure the chain-adjusting assembly by install-
ing the jam nut and nut.

e. Position the chain adjustment shield over the

chain adjustment assembly; secure the shield
by installing the bolts and washers.

25.

Adjust the retract and extend chains to the proper
torque. (See adjusting procedures of Section 4.2).

26.

Install the hydraulic hoses, electrical cables, and the
harnessing power track components as follows:

a. Properly position the fly section carrier tube with

carrier tube bracket installed at the side of the
boom. Align the attachment holes the forward
end of the carrier tube with those of the fly sec-
tion mounting plate. Secure the carrier tube by
installing the bolts, washers, lock washers and
nuts. Align the support bracket with attachment
holes in the mid boom and secure with bolts and
washers.

b. Properly position the assembled hoses, electri-

cal cable, and the harnessing power track onto
the base section carrier tube. Carefully feed the

proper hose and cable ends through the fly sec-
tion carrier tube and into the hole in the boom fly
section. Properly align the power track end with
the attachment point of the fly section carrier
tube; install the bolts, washers, lock washers
and nuts which secure the power track to the
carrier tube.

c. Carefully feed the remaining hose and cable

ends aft through the base section carrier tube.
Properly align the remaining power track end
with the attachment point of the base section
carrier tube; install the bolts, washers, lockwash-
ers and nuts which secure the power track to
carrier tube.

d. Ensure all hoses and cables are properly routed

through the carrier tube and power track.
Tighten or install all clamping or securing appa-
ratus to the hoses or cables, as necessary.

Installation

1.

Using suitable lifting equipment, position the assem-
bled boom on turntable so that boom pivot holes in
both boom and turntable are aligned.

2.

Insert boom pivot pin, ensuring that locating slots in
pin are aligned with setscrew locating holes in pin
bushings.

3.

If necessary, gently tap the pin into position with a
soft headed mallet. Secure the pin with setscrews.

4.

Connect all wiring to the ground control box.

5.

Using all applicable safety precautions, operate lift-
ing equipment in order to position the boom lift cyl-
inder so the holes in the cylinder rod end and boom
structure are aligned. Insert the lift cylinder pin.

6.

If necessary, gently tap the pin into position with a
soft headed mallet, ensuring the pin plate holes are
aligned with the attach holes in the boom structure.
Install the pin attaching bolts, washers and lock-
washers.

7.

Shut down all machine systems.

8.

Connect the hydraulic lines running alongside of
boom.

9.

Using all applicable safety precautions, operate the
machine systems and raise and extend the boom
fully, noting the performance of the extension cycle.
If chattering is apparent, the extend chain system
requires adjustment.

10.

Retract and lower the boom, noting the performance
of the retraction cycle. If chattering is apparent, the
retract chain system requires adjustment.

11.

Shut down all machine systems.

12.

Adjust the extend and retract chain systems as
required and secure the adjustment locknuts.

Advertising