JLG 80HX_HX+6_HXER ANSI Service Manual User Manual

Page 42

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-4

– JLG Lift –

3120271

13.

While keeping thrust washers in place, slide cluster
gear into carrier with larger gear on side with small
pin hole.

14.

Line up cluster gear and thrust washers with hole in
carrier and slide planet shaft through. Ensure cham-
fered side of hole in planet shaft is lined up with pin
hole in carrier.

15.

Drive anti-roll pin flush into carrier hole, locking
planet shaft into place.

16.

Repeat steps 8 thru 15 for remaining two cluster
gears.

Input Shaft Assembly

EYE PROTECTION SHOULD BE WORN DURING RETAINING RING
REMOVAL AND INSTALLATION.

1.

Carefully remove retaining ring (34) from input shaft
(35) and discard retaining ring.

2.

Remove two spacers (31) and spring (32) from input
shaft.

3.

Clean and inspect all parts as outlined under Clean-
ing and Inspection.

4.

Place washer (31), spring (32), and washer (31), in
that order, onto input shaft.

5.

Install retaining ring into input shaft groove to secure
spacers and spring to shaft.

Assembly

1.

Using a suitable press, press new bearing cups
(3,5), with large inside diameters facing out, into hub
(7) counterbores.

Advertising