8 order of installation – ADS-TEC OPC7013/7015/7022 User Manual

Page 20

Advertising
background image

Industrial PCs OPC7013/7015/7022

20

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

3.8

O

RDER OF INSTALLATION

I

NTEGRATING THE DEVICE IN AN INSTALLATION RECESS

Warning:

The PC must be switched off before connecting or disconnecting any cables in order to

prevent damage to the electronics!
The device may only be switched on after acclimatising to the ambient temperature in

order to avoid condensate accumulation.
Make sure to meet the permissible voltage requirements for this device.
After switching off and before switching on you must wait for at least 5 seconds.

Note:
The device is connected with the power supply network by using the enclosed power

cable or by using a lead-through terminal incl. a screw connection. Establishing a

separate earthing connection is not required since the earthing is done via the protective

earth connection of the device plug / power supply connector. If additional earthing is

provided, a wire cross section of at least 2.5mm² must be used.


1)

Cut out the recess from the switch board or switching cabinet door in accordance with
the installation layout.

The fixing screws for the tensioners must be installed.

The screws can be loosened by using a screw driver of size TX8.

Advertising