Lift blocking instructions – Autoquip DOUBLE PANTOGRAPH LIFT User Manual
Page 21
Advertising
21
LIFT BLOCKING PROCEDURE– (continued)
5. Follow OSHA electrical lock-out/tag-out procedures. Disconnect and tag all
electrical and/or other power sources to prevent an unplanned or unexpected
actuation of the lift.
6. Once inspection or work is complete reverse steps 1-5 above, raise the lift off the
maintenance device and place the maintenance device back into the designated
storage position.
LIFT BLOCKING INSTRUCTIONS
Advertising