Installing measuring tape, Installation procedures – Condux Winch Line Blower System User Manual
Page 17
Advertising

CONDUX WINCH LINE BLOWER
15
3. Installing Measuring Tape
Installation Procedures
1. Clean out the end of the conduit to remove any dirt or gravel that may get between the
conduit and the Threaded Adapter. Apply a ¼” cup of lubricant into the duct system.
2. Remove rope venture if installed See Figure 1
3. Insert the seal disk plug into rope venturi slot See Figure 2
Figure 1 Remove Rope Venturi
Figure 2 Insert Seal Disk Plug
Advertising