Condux Winch Line Blower System User Manual
Page 19
Advertising

CONDUX WINCH LINE BLOWER
17
5. Insert measuring tape through the 3/8” rope adapter See Figure 5
6. Attach measuring tape to carrier and install carrier into the duct See Figure 6
!CAUTION: Before each use, visually inspect the winchline blower body assembly,
threaded adapters and missiles for signs of wear, fatigue, and/or breakage. If any of
these items show signs of wear, they should be replaced, or system function and
efficiency will affected (Reference Appendix)
Figure 5 Insert Measuring Tape through 3/8” Rope Adapter
Figure 6 Attach Measuring Tape to Carrier and Insert into Duct
Advertising