Chapter 5: installation, 1 unpacking the drive components, Chapter 5 – ElmoMC ExtrIQ Gold Line Servo Drives-Gold Tiger User Manual

Page 12: Installation, Unpacking the drive components

Advertising
background image

Gold Tiger Installation Guide

MAN-G-TIGIG (Ver. 1.000)

|Unpacking the Drive Components|

www.elmomc.com

12

Table of Contents

Chapter 5:

Installation

The Gold Tiger must be installed in a suitable environment and properly connected to its voltage
supplies and the motor.

5.1 Unpacking the Drive Components

Before you begin working with the Gold Tiger, verify that you have all of its components, as follows:

The Gold Tiger servo drive

The Elmo Application Studio (EAS) software and software manual

The Gold Tiger is shipped in a cardboard box with Styrofoam protection.
To unpack the Gold Tiger:
1.

Carefully remove the servo drive from the box and the Styrofoam.

2.

Check the drive to ensure that there is no visible damage to the instrument. If any damage
has occurred, report it immediately to the carrier that delivered your drive.

3.

To ensure that the Gold Tiger you have unpacked is the appropriate type for your
requirements, locate the part number sticker on the side of the Gold Tiger. It looks like this:

Figure 1: Gold Tiger Part Number Sticker

4.

Verify that the Gold Tiger type is the one that you ordered, and ensure that the voltage
meets your specific requirements.

The part number at the top provides the type designation. Refer to the appropriate part

number in the section Catalog Number at the beginning of the installation guide.

Advertising