12 powering up, 13 initializing the system, 12 powering up 6.13 initializing the system – ElmoMC ExtrIQ Gold Line Servo Drives-Gold Tiger User Manual

Page 62

Advertising
background image

Gold Tiger Installation Guide

MAN-G-TIGIG (Ver. 1.000)

||Powering Up|

www.elmomc.com

62

Table of Contents

6.12 Powering Up

After the Gold Tiger is connected to its device, it is ready to be powered up.

Caution:

Before applying power, ensure that the DC supply is within the specified range

and that the proper plus-minus connections are in order.

6.13 Initializing the System

After the Gold Tiger has been connected and mounted, the system must be set up and initialized.
This is accomplished using the EASII, Elmo’s Windows-based software application. Install the
application and then perform setup and initialization according to the directions in the EASII User
Manual
.

Advertising